Medical electronics live and die by isolation, EMC and traceability. We design PCBs to IEC 60601-1, IEC 60601-1-2 and IEC 62304 from the first stackup — not as a re-spin after the audit fails.
What medical PCB design actually requires
IEC 60601-1 creepage/clearance: 8 mm minimum at 250 VAC mains-connected, Class I. This drives your board edge clearance, connector spacing, and layer stack — most off-the-shelf stackups don’t have enough isolation distance.
IPC-A-610 Class 3: Medical boards require Class 3 inspection. Cold solder, lifted pads, and insufficient fillet are automatic rejects. We design and inspect to Class 3 natively.
Conformal coating: IPC-CC-830 Type AR (acrylic) or UR (urethane) for moisture resistance. Coating thickness must be verified by cross-section on the first article.
Patient-contact thermal: ISO 14971 risk analysis limits patient-contact surfaces to 43 °C steady-state. TRM thermal simulation gives you the data to prove compliance — before fab.
Component traceability: Lot codes, date codes, and CoC documentation required from component level. Design your BOM for this — dual-source preferred, single-source flagged in our DFM review.
EMC: IEC 60601-1-2 Ed4 — 8 kV contact ESD, 15 kV air discharge, 4 kV on I/O. Your layout determines whether you pass first-time or respend $15K on re-test.
8 mmcreepage at 250 V (60601-1)
2× MOPPpatient-isolation classes
Class 3IPC reliability target
ISO 13485QMS-aware design files
⎁ What you get
The deliverables.
01
Isolation-first stackup
MOPP/MOOP zones drawn into the floorplan, with creepage and clearance to 60601-1 working voltages and reinforced barriers under the isolation transformer.
02
Low-noise analog
Quiet reference planes, guarded inputs and Kelvin sensing for ECG/EEG/SpO2 front-ends — µV-class input-referred noise verified on the bench.
03
EMC by design
Pre-compliance review against IEC 60601-1-2 emissions and immunity: dV/dt control, return-current management, filter sizing at the IC pin.
04
DHF-ready files
Versioned stackup, impedance table, risk register and review log handed off in the format your Design History File or Technical File expects.
⎁ Standards & capabilities
Built for this sector.
Standards we design to
IEC 60601-1 (electrical safety, isolation)
IEC 60601-1-2 (EMC)
IEC 62304 (software lifecycle awareness)
ISO 14971 (risk-aware layout)
IPC-A-600 / J-STD-001 Class 3
Analog front-ends
ECG / EEG / EMG
SpO2, NIBP, capnography
Ultrasound + imaging analog
Galvanic + optical isolation
Sigma-delta and SAR ADC layout
Reliability + assembly
IPC Class 3 spacing and via rules
Conformal coating + potting clearance
Tear-drops and filled vias
BGA escape with redundant pads
10-year service-life materials
⎁ Sample engagement
A wearable ECG hitting a 1 µV noise floor.
The brief
A 24-bit ECG front-end on a coin-cell wearable was eating noise from the BLE radio and the buck converter sharing the 4-layer board.
What we did
Re-floorplanned the analog island with a stitched guard ring and a separate quiet return back to the AFE pin.
Moved the buck switching loop away from the AFE and gave the antenna a ground-stitched keep-out instead of a cavity.
Re-derived the input filtering against the 60601-1-2 RF immunity envelope; added series ferrites at the electrode entry.
Outcome
Input-referred noise dropped to ~1 µV RMS in the diagnostic band — within 0.5 µV of the AFE datasheet limit — without changing the board outline.
⎁ FAQ
Common questions.
Do you run 60601-1 testing yourselves?
No — we DESIGN to 60601-1 and run pre-compliance reviews of the layout. Final chamber testing is a partner referral; our design hands off so the test pass is the expected outcome, not a surprise.
Can you work inside our ISO 13485 QMS?
Yes. We deliver versioned design files, traceable design decisions and a risk-aware change log suited to your DHF or Technical File. We aren’t ISO 13485 certified ourselves — we design to support yours.
Do you default to IPC Class 2 or Class 3?
Class 2 is our default; we step to Class 3 (or 3A) when the device function, patient-contact or service life justifies it. We’ll tell you which is justified — not just upsell the strictest.
Pass the audit on the first article.
Isolation, EMC and DHF-ready files from day one. Fixed-fee band in 60 seconds.